Carbon Reduction Plan

Commitment to Achieving Net Zero

Abbott Construction is committed to achieving Net Zero greenhouse gas emissions by 2050, in line with UK Government targets.

As a small and medium-sized enterprise (SME) operating primarily through a subcontracted delivery model, we recognise that the majority of our carbon emissions arise within our supply chain (Scope 3), including subcontracted works, material use, transport, and waste management.

We are committed to improving the measurement, management, and reduction of emissions across all scopes, working collaboratively with subcontractors and suppliers to deliver lower-carbon outcomes.

This Carbon Reduction Plan forms part of Abbott Construction’s wider Corporate Social Responsibility (CSR) framework and should be read in conjunction with our Environmental Policy and Social Value Policy to ensure a coordinated approach to sustainability and social impact.

Baseline Emissions Footprint

Abbott Construction has established an initial carbon baseline based on available operational and project data.

Baseline Year: 2025
Emissions CategoryTotal (tCO₂e)
Scope 142.6 tCO₂e
Scope 24.2 tCO₂e
Scope 312.7 tCO₂e (waste only – partial)

Current Emissions Reporting

Reporting Year: 2025
Emissions CategoryTotal (tCO₂e)
Scope 142.6 tCO₂e
Scope 24.2 tCO₂e
Scope 312.7 tCO₂e (waste only – partial)

Total measured emissions: 59.5 tCO₂e (excluding wider Scope 3 emissions such as subcontracted works, materials and transport)

Scope 1 Emissions (Fuel Use)

Scope 1 emissions arise primarily from fuel consumption in company vehicles and plant, based on total fuel usage across operations.

During the reporting period: 

Diesel14,569.82 litres
Petrol1,525.57 litres
Emissions have been calculated using recognised conversion factors
Diesel39.05 tCO₂e
Petrol3.52 tCO₂e

Total Scope 1 emissions: 42.6 tCO₂e

Abbott Construction has begun transitioning to lower-emission transport, with two directors operating electric vehicles as part of company operations. These vehicles reduce reliance on fossil fuels and contribute to lowering Scope 1 emissions. Associated emissions from EV use fall under Scope 2 where applicable.

Scope 2 Emissions (Purchased Energy)

Scope 2 emissions relate primarily to electricity used within office operations.

During the reporting period:

Imported electricity (grid supply)17,800 kWh
Solar energy generated and consumed on-site23,000 kWh

This indicates that approximately 56% of office electricity demand is met through on-site renewable energy generation.

Scope 2 emissions are calculated using imported grid electricity only, resulting in:

Total Scope 2 emissions: 4.2 tCO₂e

The significant contribution of on-site solar panels substantially reduces reliance on grid electricity and demonstrates Abbott Construction’s commitment to reducing operational carbon emissions.

Due to the subcontracted delivery model, most site-based energy consumption is arranged and managed by clients or subcontractors and is not currently captured within this dataset.

Scope 3 Emissions (Waste)

Abbott Construction generated a total of 224.86 tonnes of construction waste during the reporting period.

Waste has been managed in accordance with the waste hierarchy:

Recycled204.93 tonnes91.14%
Recovered8.34 tonnes3.71%
Energy From Waste6.88 tonnes3.06%
Landfill4.76 tonnes2.12%

This demonstrates strong environmental performance, with approximately 98% of waste diverted from landfill.

Estimated emissions from waste:

Recycling6.15 tCO₂e
Recovery1.67 tCO₂e
Energy from Waste3.44 tCO₂e
Landfill1.43 tCO₂e

Total Scope 3 (waste) emissions: 12.7 tCO₂e

Waste data reflects waste streams directly arranged and managed by Abbott Construction. Waste managed by subcontractors is not currently captured and will be incorporated as data collection improves.

Subcontractor and Supply Chain Emissions (Scope 3)

Due to the subcontracted delivery model, the majority of Abbott Construction’s emissions arise from:

  • Subcontracted construction works
  • Materials procurement
  • Waste managed by subcontractors
  • Transport and logistics

These elements represent the largest portion of the organisation’s overall carbon footprint.

The current Carbon Reduction Plan reflects emissions where data is available, with a commitment to expanding Scope 3 reporting in future.

Approach to Managing Supply Chain Emissions

Abbott Construction will:

  • Engage subcontractors to promote efficient material use and waste minimisation
  • Encourage responsible waste management, prioritising recycling and landfill reduction
  • Promote local sourcing to reduce transport emissions
  • Begin incorporating environmental and carbon considerations into subcontractor selection
  • Request carbon and environmental data from key subcontractors where available
  • Support supply chain partners in aligning with project-specific carbon reduction goals

Emissions Reduction Targets

Abbott Construction is committed to:

  • Establishing a fully quantified carbon baseline across all scopes by 2026/27 reporting period
  • Expanding Scope 3 reporting to include subcontractor and materials emissions
  • Maintaining recycling rates above 90%
  • Reducing landfill waste to below 2% where achievable
  • Increasing adoption of low-emission and electric vehicles
  • Improving energy efficiency across operations
  • Achieving Net Zero emissions by 2050

Carbon Reduction Initiatives

Scope 1 & 2

  • Reduce fuel consumption through improved planning and logistics
  • Minimise unnecessary travel
  • Increase use of electric and low-emission vehicles
  • Improve energy efficiency in office operations
  • Continue use and optimisation of on-site renewable energy (solar)

Scope 3 (Supply Chain and Waste)

  • Maintain high levels of waste segregation and recycling
  • Reduce landfill through better planning and subcontractor engagement
  • Promote efficient material use
  • Encourage local suppliers and subcontractors
  • Develop structured engagement around supply chain carbon reduction

Future Actions

Abbott Construction will:

  • Develop processes to capture emissions data from subcontractors
  • Expand reporting to include:
    • Materials
    • Transport
    • Subcontractor activities
  • Align project delivery with client Net Zero and sustainability goals
  • Investigate low-carbon construction methods and materials

Governance

Carbon reduction is managed through Abbott Construction’s operational structure:

  • Contracts Manager – overall responsibility
  • Site Managers – implementation and monitoring
  • Subcontractors and suppliers – key delivery partners

Progress will be reviewed regularly to ensure continuous improvement.

Methodology

Abbott Construction has calculated its carbon emissions in accordance with recognised UK Government guidance and industry standards.

Emissions have been calculated using activity data (e.g. fuel consumption, electricity use, and waste tonnage) multiplied by appropriate greenhouse gas (GHG) conversion factors, using the following general formula:

Activity Data × Emission Factor = tCO₂e

All emissions are reported in tonnes of carbon dioxide equivalent (tCO₂e).

Standards and Guidance

This Carbon Reduction Plan has been prepared in line with:

  • UK Government Greenhouse Gas Conversion Factors for Company Reporting (DEFRA / DESNZ)
  • The Greenhouse Gas Protocol Corporate Accounting and Reporting Standard
  • PPN 06/21 / PPN 006 Technical Standard for Carbon Reduction Plans

Government conversion factors are the standard method used by UK organisations to convert activity data into carbon emissions and are recommended for use in Carbon Reduction Plans.

Scope Definition

Emissions have been categorised in accordance with the Greenhouse Gas Protocol as:

  • Scope 1: Direct emissions from owned or controlled sources (e.g. company vehicles, plant and fuel use)
  • Scope 2: Indirect emissions from purchased electricity
  • Scope 3: Indirect emissions from downstream and upstream activities (e.g. waste, subcontractors, materials)

This approach aligns with UK Government requirements for Carbon Reduction Plans, which require reporting of Scope 1, Scope 2, and a subset of Scope 3 emissions.

Data Sources

Emissions calculations are based on the following data sources:

  • Fuel usage records (litres of diesel and petrol)
  • Electricity consumption data from energy supplier (kWh)
  • Solar generation data from on-site solar system
  • Waste transfer data from licensed waste contractors (tonnes and disposal routes)

Where primary data is available, this has been used directly. Where data is not currently available, emissions have been partially reported and clearly identified within the plan.

Assumptions and Limitations

Abbott Construction operates primarily through a subcontracted delivery model, which affects the availability of emissions data.

  • Scope 1 emissions are considered complete, based on company-controlled fuel use
  • Scope 2 emissions reflect office-based electricity consumption only, as site energy is typically managed by clients or subcontractors
  • Scope 3 emissions currently include waste data only, representing waste streams directly managed by Abbott Construction

Emissions arising from subcontracted works, materials, transport, and subcontractor-managed waste are not yet fully captured and are identified as areas for future improvement.

Future Improvements

Abbott Construction is committed to improving the accuracy and completeness of emissions reporting by:

  • Developing processes to capture subcontractor and supply chain emissions
  • Expanding Scope 3 data to include materials, transport, and subcontracted activities
  • Improving data collection across both project and office operations
  • Reviewing calculation methodologies annually in line with updated Government conversion factors

Declaration and Sign-Off

This Carbon Reduction Plan has been prepared in accordance with PPN 06/21 and associated guidance.

Emissions have been calculated using recognised conversion factors and reflect the current level of available data. Abbott Construction is committed to improving data accuracy and completeness over time.


Carbon Reduction Plan | v1 | July 2026