Our experience being contractors of new school buildings has brought us back on site at the School of Science and Technology in Maidstone. We have completed an extension to the sports hall for the increasing student roll across the three VIAT schools on this site, as a shared facility.
Extensive groundworks combined with Vibro piling were undertaken to prepare the space for the additional building before connecting a steel frame to the original structure.
The new build includes an entire new sports hall with store, offices and changing rooms, as well as improving the acoustic performance of the original sports hall delivered in 2020. It was important to fit the new building with the same, if not similar, materials to the existing hall to create a seamless transition.
The facility was delivered in July 2024 for more students to enjoy indoor sporting activities and an exciting place to learn.